Works carried out within the framework of the project of reconstruction of water and sewage systems in the city of Khizı during 2017-2019 period.
"ASİYA LTD" LLC participated in the implementation of drinking water supply and sewerage system reconstruction projects in the regions of Azerbajan in accordance with the State Program of Social and Economic Development of the Regions of the Republic of Azerbaijan. Reconstruction of the water supply and sewerage systems of the city of Khizi was completed in 2019 as part of the "Water supply and sewerage project in small cities" jointly funded by the Government of Azerbaijan and the Japan International Cooperation Agency. As part of the project, which started in 2012, water intake facilities with a productivity of 430 cubic meters per day at the Kars headwaters, and 40 cubic meters per day at the Yeddibulag headwaters were built, and 8.4 km of main water line was built. The city's demand for drinking water will be fully covered by the newly created Dahardibi and Shafa headwaters with a total capacity of 1084 cubic meters. Main water pipelines with a total length of 9.6 km were laid from these headwaters to settlements. The construction of 2 water reservoirs with a total capacity of 1000 cubic meters has been completed in the city of Khizi in order to provide consumers with uninterrupted and high-quality drinking water. Drinking water and sewage networks have been built in the settlement. Each house is being connected to the completed network, and meters/counters are being installed. Within the framework of the project, final completion works have been carried out in the